Quality Control
Home / About Us / Quality Control
Company Quality Certification Process
I. Overall Quality Objectives
  • Incoming material acceptance rate ≥ 98%
  • Process acceptance rate ≥ 96%
  • Shipment acceptance rate ≥ 99%
  • On-time delivery rate = 100%
  • Monthly customer returns (return batches) < 2
II. Departmental Quality Targets and Procedures
1. Engineering Department
Targets
  • On-time task completion rate: ≥ 99% per month
  • Design errors: ≤ 2 times per year
Procedures
  • All tasks must be recorded with assigned deadlines; delays require written explanation.
  • Engineering design documents must be reviewed by relevant departments to prevent errors from entering production.
2. Document Control Department
Targets
  • Document return rate: 100% per month
Procedures
  • All distributed documents must be tracked and collected on time.
  • Invalid or outdated documents must be withdrawn and updated immediately.
3. Administration & HR Department
Targets
  • Training rate for new employees ≥ 95%, with mandatory induction training
Procedures
  • HR must complete quality, production, and safety training within one week of new employee entry.
  • Training records and attendance sheets must be kept on file.
4. Warehouse Department
Targets
  • Inventory accuracy rate ≥ 99.5%
Procedures
  • All material receipts and issues must be recorded; regular stock audits are required.
  • Any discrepancies must be investigated and corrected.
5. Procurement Department
Targets
  • On-time delivery rate of purchased items ≥ 98%
  • Incoming material acceptance rate ≥ 98% per month
Procedures
  • All purchase orders must be monitored for delivery timeliness; supplier performance is to be regularly assessed.
  • All incoming materials must pass IQC inspection; nonconforming items must be returned or quarantined.
6. Quality Department
Targets
  • Shipment acceptance rate ≥ 99%
  • Monthly customer returns ≤ 2 batches
Procedures
  • Products must undergo full inspection or sampling inspection before shipment.
  • Customer returns must be analyzed using the 8D method, with corrective and preventive actions implemented.
7. Production Department
Targets
  • On-time product delivery rate = 100%
  • Process acceptance rate ≥ 96%
Procedures
  • First article inspection, in-process inspection, and final inspection must be carried out during production.
  • Any process nonconformity must be corrected immediately to prevent defective items from flowing into the next stage.
III. Quality Monitoring & Statistical Frequency
  • Each department shall collect and report data according to the following frequency:
    • Monthly: task completion rate, document return rate, process acceptance rate, incoming material acceptance rate, etc.
    • Quarterly: shipment acceptance rate, on-time delivery rate, etc.
    • Annually: number of design errors
  • The Quality Department is responsible for consolidating data into monthly, quarterly, and annual quality reports.
IV. Continuous Improvement
  • For any target not achieved, the responsible department must submit a corrective action report.
  • The Quality Department is responsible for follow-up and verification of corrective actions.
  • Management shall hold regular quality review meetings to evaluate improvement measures and drive continuous enhancement.
  • China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    Design Patent Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    BSCI Report
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    ISO 9001
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    Design Patent Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    UKCA
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    RoHS
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    CE Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    RoHS
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    Trademark Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    Trademark Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    FCC
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    FCC certificate
  • China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    KC Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    PSE Ceriftcate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    TUV
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    UL Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    ERP Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    EMC Report
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    FCC Certificate
    China SHENZHEN XINJUNMENG ENERGY TECHNOLOGY CO.,LTD certifications
    EPA Certificate